Click to Enlarge

Bonney Lake Elementary - Bonney Lake, WA

 
Owner: Sumner School District
Architect: BLRB Architects
General Contractor: Commercial Structures
Completion: Summer 2011

 

Project Description:

This project was the renovation of an existing elementary school that consisted of five separate 'islands' that centered around the main administration building. Each building was designed and themed to fit around the school's mascot, the Viking. Installation consisted of Kawneer Trifab Thermally-Improved Storefront systems and 8225TLXO windows with a Champagne anodized finish to provide a unique look. The glazing consisted of PPG's Solarban 60 low-e coating to help with improved system performance. The entrances were '500 Heavy Wall' doors that are designed to stand up to the abuse created in educational and institutional construction projects.