Click to Enlarge

Hazen HS Addition - Renton, WA

 
Owner: Renton School District
Architect: DLR Group
General Contractor: Jody Miller Construction
Completion: Fall 2011

 

Project Description:

Addition to the existing Hazen High School and partial re-model included installation of EFCO's 4-1/2" and 6" storefront systems. Sunshades were mounted to steel tabs above south-facing windows to help achieve LEED points through the use of daylighting, along with high recycled content. Custom display cases were installed underneath an interior sloped curtain wall system. Mission Glass also custom fabricated 3Form® translucent panels on two sides of an interior elevator tower to create visual interest in what would otherwise have been a concrete tower.