Project Description

Architect: DLR Group

General Contractor: Jody Miller Construction

Completion: Fall 2011

Addition to the existing Hazen High School and partial re-model included installation of EFCO’s 4-1/2″ and 6″ storefront systems. Sunshades were mounted to steel tabs above south-facing windows to help achieve LEED points through the use of daylighting, along with high recycled content. Custom display cases were installed underneath an interior sloped curtain wall system. Mission Glass also custom fabricated 3FormĀ® translucent panels on two sides of an interior elevator tower to create visual interest in what would otherwise have been a concrete tower.