Project Description

Architect: NAC Architects

General Contractor: Absher Construction

Completion: Summer 2010

 

 

The Lakes High School project was a complete replacement of the existing structure. Quantity, as well as quality would best describe the 15,000 square feet of storefront and glazing that went into this project. The project required two separate main phases, with two mobilization efforts. Performance values were achieved through the thermally-improved storefronts as well as Solarban60 low-e glazing.